• Read our RSS feeds
  • Join the Metal Bulletin group on LinkedIn
  • Follow us on Twitter
  • Follow us on Youtube

Copying and distributing are prohibited without permission of the publisher

Vale posts record met coal output in 2012 on Moatize ramp-up

February 01, 2013 - 19:05 GMT Location: São Paulo

KEYWORDS: Vale , Brazil , Mozambique , Africa , metallurgical coal , Australia , coal

Vale’s metallurgical coal production hit a record high in 2012 at 5.08 million tonnes, the Brazilian miner announced on Friday February 1.

This compares with an output of 2.76 million tonnes in 2011. The increase was mainly as a consequence of the ramp-up at its Moatize operation in Mozambique. In its full year of operation, Moatize produced 2.5 million tonnes of metallurgical coal, against 275,000 tonnes in 2011. The 11 million-tpy metallurgical and thermal coal project...

All material subject to strictly enforced copyright laws. © Euromoney Institutional Investor PLC.


subscribe to this feed Comment & analysis