The study will focus on construction of a water electrolysis plant at the STEAG site in Duisburg-Walsum by Thyssenkrupp Uhde Chlorine Engineers, the structuring of energy supply and operation of the electrolysis plant by STEAG, and the supply of green hydrogen and oxygen to Thyssenkrupp’s mill in Bruckhausen.
The water electrolysis system will be installed by Thyssenkrupp Uhde Chlorine Engineers’ Green Hydrogen product division and will consist of pre-fabricated standard modules.
“We are excited to contribute our 50 years of experience in the planning, construction and operation...